Stoneham High School

  • Client: Town of Stoneham, Massachusetts School Building Authority
  • Size: 207,000 square feet
  • Completion Date: 2024
  • General Contractor- Consigli construction

Plumbing Cost : 6-7 Million

In support of the town’s climate action goals, the new Stoneham High School is being designed as one of the most sustainable large high schools in the country. The facility is targeting zero on-site fossil fuel use and net-zero energy performance, setting a benchmark for environmentally responsible school design.

Key sustainability features include:

  • A mechanical system engineered to minimize water usage
  • Athletic fields that double as large infiltration areas to manage stormwater naturally
  • A high-performance building envelope that reduces air and vapor infiltration
  • Classroom layouts that maximize natural daylight while minimizing glare